Special Offer: EV Charger Supply & Install from £795View offer →
28 Stanley Gardens, Liverpool L9 3ARAvailable day or night · 24/7 Emergency
info@fixelectricalnw.co.uk
Fix Electrical (NW) Ltd
Call now07782 498471Request Estimate
Fazakerley, L9 / L10

£795 EV charger supply & install in Fazakerley.

Fazakerley homes are ideal for home EV charging: mostly semi-detached and detached properties with driveways, close to the M57 and M58. The £795 Fix Electrical and Leaf Eco Electrical supply and install package is available across the area.

Claim The £795 Offer 07782 498471
NAPIT approved
Certified installers covering Fazakerley
£2m public liability
Fully insured on every install
OZEV-grade hardware
Smart 7kW Type 2 chargers
3 year workmanship
Backed by our own name and number
Expanded Local Guide

Not just the offer, a full Fazakerley EV charger installation guide.

This Fazakerley page is written around the types of homes we see near Longmoor Lane, Higher Lane, Moss Lane, Formosa Drive, Sedgemoor Road and the streets around Aintree University Hospital. The area has plenty of semis with side drives and garages, which often makes a 7kW home charger a neat and cost-effective upgrade.

The content below is not a copied Liverpool page with the area name swapped in. It covers Fazakerley-specific survey points: garage mounting, side-drive cable routes, shift-worker charging routines, easy motorway commuting and the consumer unit layouts common in L9 and L10 homes.

Fazakerley property notes

Most Fazakerley homes are inter-war and post-war semis with garages or side driveways. Cable runs are usually straightforward and consumer units are often in the hallway or under the stairs, which keeps installs tidy.

Local parking suitability

Off-street parking is common in Fazakerley, so the standard £795 package fits most properties without extra groundworks.

What the install covers

Everything from initial phone advice to final certification: 7kW smart charger, dedicated EV RCBO circuit, cable containment through wall or garage, load balancing configuration, testing and handover, notified to SPEN and Building Control.

DNO and certification

We handle SPEN notification, electrical certification, Part P notification and smart charger handover for every standard Fazakerley install.

Special Offer, Fazakerley

7kW EV charger, supply & install
from just £795.

In partnership with Leaf Eco Electrical Leaf Eco Electrical. Installed, tested and certified by Fix Electrical.

  • Premium 7kW EV charger (tethered or untethered)
  • Professional installation by Fix Electrical
  • Up to 5 metre cable run (standard install)
  • Full testing & certification
  • Smart app setup & handover
  • 3 year warranty, no hidden costs

Standard install in Fazakerley, subject to on-site survey. Additional cabling, groundworks or DNO applications quoted separately.

Our Popular Package
Supply & install from only
£795
Leaf Eco Electrical×Fix Electrical

Quality products, expert installation

Why Fazakerley

Local team, local install

We cover Fazakerley daily from our Walton base, so surveys and installs are quick to book and easy to reschedule if plans change. Local jobs stay local, which keeps the price honest.

Property notes

What to expect

Most Fazakerley homes are inter-war and post-war semis with garages or side driveways. Cable runs are usually straightforward and consumer units are often in the hallway or under the stairs, which keeps installs tidy.

Parking & suitability

Is it right for you?

Off-street parking is common in Fazakerley, so the standard £795 package fits most properties without extra groundworks.

Service Overview

EV charging in Fazakerley, the full picture.

Straight talk about what the £795 install actually is, who benefits, when to book it and why using a proper local contractor matters more than the sticker price. The aim is to help Fazakerley drivers understand the whole job before they request a survey, not just the headline price.

We regularly install around Longmoor Lane, Formosa Drive, Sedgemoor Road, Moss Lane, Higher Lane and the estates near Fazakerley Hospital and Aintree University Hospital. Both the L9 and L10 halves of Fazakerley sit inside our core same-week booking area.

What it covers

Everything from initial phone advice to final certification: 7kW smart charger, dedicated EV RCBO circuit, cable containment through wall or garage, load balancing configuration, testing and handover, notified to SPEN and Building Control.

Who it's for in Fazakerley

Commuters using the M57 and M58, hospital staff at Aintree and Fazakerley, and families upgrading their first EV. Fazakerley properties tend to be well-suited technically, so most installs stay firmly on the £795 price.

When you need it

Ideally two weeks before your car arrives, so the charger is live on day one. If your EV is already on the drive, we can usually still turn a Fazakerley install around inside a week.

Why a local installer matters

A Fazakerley job is 10 minutes from our Walton base. That means realistic arrival times, quick warranty call-outs, and a contractor you can actually put a face to.

Cost Of Waiting

What another month of public charging in Fazakerley really costs.

The £795 install pays itself back fast. Here is what you are actually paying for by putting it off.

Hospital shift patterns make public charging awkward

Fazakerley and Aintree hospital staff often need the car ready outside normal hours. Relying on public chargers before or after a shift is expensive and inconvenient compared with a charger scheduled to finish before you leave home.

Garage routes can be wasted if not planned

Many Fazakerley homes have ideal garage or side-wall positions. A rushed installer may still choose the easiest route rather than the neatest long-term route. The survey lets us plan the charger around how you actually park.

Motorway mileage raises the saving

Drivers using the M57 and M58 regularly tend to cover higher mileage. The more miles you do, the faster a home charger repays itself through smart-tariff charging.

Second EV demand is growing

Fazakerley households with two cars are increasingly moving one car, then both cars, to electric. Planning load management during the first install avoids expensive rework later.

Our Process

How your Fazakerley install runs, start to finish.

  1. Step 1

    Fazakerley parking review

    We confirm whether the charger should go on the front wall, side drive, garage wall or an agreed external position.

  2. Step 2

    Consumer unit and garage survey

    We inspect spare ways, tails, bonding and the cable path into any garage or side wall before confirming whether the install is standard.

  3. Step 3

    Smart charging plan

    If you work shifts or commute on the motorway, we discuss charging windows so the app is set up for your real routine.

  4. Step 4

    Install and commissioning

    The charger is fitted, tested, connected to Wi-Fi and set up for app control in the same visit where the property is standard.

  5. Step 5

    Certification pack

    We issue the certificate, handle DNO notification and show you how to schedule charging on your chosen tariff.

Why Fix Electrical

What Fazakerley customers get for £795.

Ideal for side drives and garages

Fazakerley homes often allow clean charger positioning with short, protected cable runs.

Strong fit for commuters

A home charger is especially useful for drivers using the M57, M58 and A580 regularly.

Shift-worker friendly

We set up charging schedules around early starts, late finishes and hospital shift patterns.

Same-week local coverage

From Walton, Fazakerley surveys are quick to arrange and simple to follow up.

Second charger planning

We can design the first install with future two-EV households in mind.

Clear standard install rules

You know exactly what is included in the £795 offer before the work is booked.

In Detail

Everything else worth knowing about EV installs in Fazakerley.

The specific property types, wiring realities and local details that decide whether your install is smooth and cheap, or a headache.

Garage-mounted installs in Fazakerley

A lot of Fazakerley semis have an integral or attached garage, which is usually the tidiest place to mount an EV charger. Cable runs from the consumer unit into the garage stay hidden, the charger is protected from weather, and the socket sits exactly where you park.

Two-car households

Where a household has two EVs or a plug-in hybrid alongside an EV, we can plan the initial install so that a second point can be added later at minimum cost, using proper load management rather than a bodged double-up.

Compliance and Aintree hospital shift patterns

Hospital staff on shifts benefit most from off-peak smart charging. We configure Octopus Go and Intelligent Octopus schedules at handover so your car is ready for the next shift at the lowest possible cost.

New-build Fazakerley properties

The newer estates around Fazakerley are already RCBO-ready and often have space in the consumer unit for a dedicated EV circuit, which keeps installs firmly inside the £795 price and finished within a few hours.

A garage-mounted charger can keep the unit out of direct weather, shorten the cable run and make daily charging easier. In Fazakerley, this is often the neatest option where the garage is attached or the driveway runs alongside the house.

Most standard installs stay within the included cable length, but detached garages, rear parking or awkward meter positions can change the quote. We measure this properly before confirming the £795 package.

This page targets Fazakerley EV charger installation with specific references to Longmoor Lane, Higher Lane, Moss Lane, Formosa Drive, Sedgemoor Road, Aintree University Hospital and L9 or L10 homes with off-street parking.

Charger Specification

The 7kW unit we install in Fazakerley.

A properly specified smart charger, not a cheap box with a badge on the front. Every unit we fit for the £795 package meets or exceeds the specification below.

Supplied through Leaf Eco Electrical
Charging speed
7.4kW (32A, single-phase)
Connector
Universal Type 2 (tethered or untethered)
Smart control
Wi-Fi + app, schedule and monitor from your phone
Load management
Built-in dynamic load balancing
Fault protection
Integrated Type A + 6mA DC-fault detection
Ingress rating
IP54+ weather-rated outdoor housing
Tariff compatibility
Octopus Go, Intelligent Octopus, EDF GoElectric, OVO Charge Anytime
Warranty
3 year unit warranty + 3 year Fix Electrical workmanship
Tethered vs Untethered

Which unit is right for your Fazakerley home?

Both options are the same price at £795 fully installed. The right choice depends on how you actually use the driveway day to day.

Tethered for regular commuters

A tethered unit suits Fazakerley drivers who plug in most nights after commuting. It is the quickest option when the same EV uses the same driveway space.

  • Best for one main vehicle
  • Quick evening plug-in
  • Convenient for early starts

Untethered for multi-car homes

An untethered unit suits households expecting different EVs, plug-in hybrids or visitor charging over time. It is also a neat choice on garage fronts.

  • Flexible Type 2 connection
  • Cleaner appearance
  • Works well on garage walls
Smart Tariff Savings

What a proper Fazakerley home install actually saves you.

Home charging on a smart EV tariff is the single biggest saving on the running cost of an electric car. Real numbers, based on average mileage.

Commuter fuel saving
£800+
possible annual saving

Fazakerley commuters covering motorway miles can save heavily by moving from public or standard-rate charging to scheduled overnight smart charging.

Shift charging
Ready
before early starts

A charger at home lets the car charge while you sleep, which is especially useful for hospital staff and shift workers.

Public charger avoidance
3-5 hrs
saved monthly

Avoiding regular public charging stops can save several hours a month, depending on mileage and queue times.

Grants, Regulations & Compliance

The paperwork behind every Fazakerley install.

Regulations, notifications and grants explained in plain English. Everything below is handled by us as part of the £795 package, you never have to chase a form.

Full certification pack at handover

Fazakerley SPEN handling

The DNO notification for Fazakerley homes is handled by us after installation, with the correct charger and property details submitted.

Garage safety

Garage installs still need a dedicated circuit, correct RCD or RCBO protection, safe containment and suitable routing through walls or voids.

Load management

Where household demand is high, dynamic load management prevents the EV charger competing with showers, ovens and other heavy loads.

Smart charge compliance

The charger is suitable for UK smart charging rules and can be configured for off-peak scheduling during handover.

What's Included

Everything covered in the £795 package.

Fazakerley home charger package

A 7kW smart charger installed on a driveway, side wall or garage where the survey confirms a standard route.

Garage and driveway planning

We agree the mount position and cable route around how you park, not a generic template.

App setup for shifts or commuting

Your charger is connected and scheduled around your working pattern and tariff.

Testing, DNO and warranty

Full test certificate, network notification and 3 year workmanship warranty included.

FAQs

EV charger questions from Fazakerley customers.

Do you install EV chargers in Fazakerley?+

Yes. Fazakerley is one of our most-covered areas and the £795 supply and install offer is available across L9 and L10.

How long does an install take?+

A standard install in Fazakerley is completed in a single visit, usually 3 to 5 hours on site.

Will the charger work with my car?+

Yes. The 7kW smart charger supplied through Leaf Eco Electrical is universal Type 2, compatible with every mainstream EV sold in the UK.

Can you fit a charger to a garage wall?+

Yes. Garage installs are very common in Fazakerley and often the neatest option, we route the cable from your consumer unit into the garage discreetly.

Is the price really £795 all-in?+

Yes. £795 covers the charger, standard installation up to 5 metres of cable, testing, certification and DNO notification. Anything non-standard is quoted openly before we start.

Do you offer a warranty?+

Yes. 3 year workmanship warranty from Fix Electrical, plus the manufacturer warranty on the charger unit itself.

Do I need to be at home during the install in Fazakerley?+

Yes, we need access to the property and consumer unit, and a quick handover at the end. Most Fazakerley installs take 3–5 hours from van door to walk-away.

Will the charger affect my home Wi-Fi or broadband?+

No. The smart charger uses your Wi-Fi like any other device, and only briefly when checking tariff windows or receiving app commands. It does not slow anything else down.

Can I charge two cars from one 7kW charger?+

Yes, but not at the same time. You swap the plug between vehicles. For simultaneous charging we can install a second unit later with proper load management, planned during the original install.

What happens if the power cuts out mid-charge?+

The charger resumes automatically when supply returns. Your car will pick up where it left off, no manual intervention needed.

Do you install commercial or workplace chargers in Fazakerley?+

Yes. The £795 offer is for standard residential installs, but we also design and install multi-point commercial EV setups with load management and back-office reporting, quoted individually for each Fazakerley site.

The Offer At A Glance

Fix Electrical × Leaf Eco Electrical.

£795 EV charger offer flyer for Fazakerley

Ready to book your £795 EV charger install in Fazakerley?

Tell us your postcode and where you'd like the charger, we'll confirm suitability and book you in. Standard Fazakerley installs are usually completed in a single visit.

Request A Free Estimate 07782 498471
Call Now Free Estimate